" The cement shall be stored in such a manner as to permit easy access for proper inspection and identification of each shipment, and in a suitable weather-tight building which will protect the cement from dampness. "
Bulletin of the U.S. Department of Agriculture - Seite 22
von United States. Department of Agriculture - 1913
Vollansicht - Über dieses Buch

Official Gazette, Band 81,Ausgaben 21-23

Philippines - 1985 - 414 Seiten
...shall be green. 11 STORAGE The cement shall be stored in such a manner as to permit easy access foe proper inspection and identification of each shipment and in a suitable weathertight building that will protect the cement from dampness and minimize warehouse set. ANNEX A POZZOLAN FOB U&a IN...
Vollansicht - Über dieses Buch

Review of American Chemical Research, Band 11

1905 - 810 Seiten
...building having the floor properly blocked or raised from the ground. (4) The cement shall be stored in such a manner as to permit easy access for proper inspection and identification of each shipment. (5) Every facility shall be provided by the contractor and a period of at least twelve days allowed...
Vollansicht - Über dieses Buch

Practical Cement Testing

W. Purves Taylor - 1905 - 348 Seiten
...building having the floor properly blocked or raised from the ground. 4. — The cement shall be stored in such a manner as to permit easy access for proper inspection and identification of each shipment. 5. — Every facility shall be provided by the contractor and a period of at least twelve days allowed...
Vollansicht - Über dieses Buch

Calcareous Cements: Their Nature, Manufacture & Uses with Some Observations ...

Gilbert Richard Redgrave - 1905 - 430 Seiten
...building having the floor properly blocked or raised from the ground. 4. The cement shall be stored in such a manner as to permit easy access for proper inspection and identification of each shipment. 5. Every facility shall be provided by the contractor, and a period of at least twelve days allowed...
Vollansicht - Über dieses Buch

Cements, Limes, and Plasters: Their Materials, Manufacture, and Properties

Edwin Clarence Eckel - 1905 - 802 Seiten
...building having the floor properly blocked or raised from the ground. 4. The cement shall be stored in such a manner as to permit easy access for proper inspection and identification of each shipment. 5. Every facility shall be provided by the contractor and a period of at least twelve days allowed...
Vollansicht - Über dieses Buch

Ordinary Foundations: Including The Coffer-dam Process for Piers

Charles Evan Fowler - 1905 - 370 Seiten
...building having the floor properly blocked or raised from the ground. 4. The cement shall be stored in such a manner as to permit easy access for proper inspection and identification of each shipment. 5. Every facility shall be provided by the contractor and a period of at cast twelve days allowed for...
Vollansicht - Über dieses Buch

A Hand-book for Cement Users

Charles Carroll Brown - 1905 - 440 Seiten
...building having the floor properly blocked or raised from the ground. 4. The cement shall be stored in such a manner as to permit easy access for proper inspection and identification of each shipment. 5. Every facility shall be provided by the contractor and a period of at least twelve days allowed...
Vollansicht - Über dieses Buch

Improved Sewerage & Sewage Disposal Contract No.13: Specifications ...

Columbus, O. Dept. of public service - 1905 - 162 Seiten
...weather-tight building having a wooden floor properly blocked or raised from the ground, and in such manner as to permit easy access for proper inspection and identification of each shipment. The Engineer shall be notified at once of each delivery of cement. Every facility shall be provided...
Vollansicht - Über dieses Buch

Experimental Engineering ...

Rolla C. Carpenter - 1906 - 908 Seiten
...building having the floor properly blocked or raised from the ground. 4. The cement shall be stored in such a manner as to permit easy access for proper inspection and identification of each shipment. 5. Every facility shall be provided by the contractor and a period of at least twelve days allowed...
Vollansicht - Über dieses Buch

Practical Reinforced Concrete Standards, for the Design of Reinforced ...

Hiram Bertrand Andrews - 1908 - 68 Seiten
...building having the floor properly blocked or raised from the ground. 4. The cement shall be stored in such a manner as to permit easy access for proper inspection and identification of each shipment. 5. Every facility shall be provided by the contractor, and a period of at least twelve days allowed...
Vollansicht - Über dieses Buch




  1. Meine Mediathek
  2. Hilfe
  3. Erweiterte Buchsuche
  4. EPUB herunterladen
  5. PDF herunterladen