| United States. Congress. Senate. Committee on Appropriations - 1965 - 1568 Seiten
...the Capitol are distorted and cracked, and require corrective action for safety and durability. 12. Retention and repair of the existing walls as corrective...the walls requiring continuing protective treatment. 13. Facing of the existing walls as corrective action with durable marble and granite, leaving the... | |
| United States. Congress. House. Committee on Appropriations - 1965 - 2002 Seiten
...the Capitol are distorted and cracked, and require corrective action for safety and durability. (12) Retention and repair of the existing walls as corrective...the walls requiring continuing protective treatment. t 13 ) Facing of the existing walls as corrective action with durable marble and granite, leaving the... | |
| United States. Congress. Senate. Appropriations Committee - 1965 - 1424 Seiten
...the Capitol are distorted and cracked, and require corrective action for safety and durability. 12. Retention and repair of the existing walls as corrective...the walls requiring continuing protective treatment. 13. Facing of the existing walls as corrective action with durable marble and granite, leaving the... | |
| United States. Congress. House. Committee on Education and Labor - 1966 - 1404 Seiten
...extension of the west central front and its reconstruction in marble, or <4» Whether any other menus of preservation are deemed feasible and advisable....foundations of structurally inferior construction with the walN requiring continuing protective treatment. (bi Facing of the existing walls as corrective action... | |
| United States. Congress. House. Committee on Appropriations - 1967 - 2206 Seiten
...obtainable for the members of the AIA for their consideration. They conclude this on their finding No. 12 : Retention and repair of the existing walls as corrective action is not recommended «s it would require the hazardous removal of much of the facing so as to allow installation of ties... | |
| United States. Congress. Senate. Committee on Appropriations - 1968 - 426 Seiten
...Committee. Numerous alternatives were considered in that report. One of the key recommendations is: "Retention and repair of the existing walls as corrective...facing so as to allow installation of ties to the back wall, or the installation of ties through the face joints with resulting disfiguration of the... | |
| United States. Congress. Senate. Committee on Appropriations - 1969 - 796 Seiten
...are deemed feasible and advisable. Their key findings and recommendations are summarized as follows : Retention and repair of the existing walls as corrective...require the hazardous removal of much of the facing with resulting disfiguration of the structure. There would still be walls and foundations of structurally... | |
| United States. Congress. Senate. Appropriations Committee - 1969 - 878 Seiten
...require corrective action for safety and durability. 12. Retention and repair of the existing wall* as corrective action is not recommended as it would require the hazardous removal of much of the f acini so as to allow installation of ties to the backup wall, or the installation of ties through... | |
| |