Hidden fields
Books Books
" The thoroughly dried and coarsely screened sample is weighed and placed on the No. 200 sieve, which, with pan and cover attached, is held in one hand in a slightly inclined position, and moved forward and backward, at the same time striking the side gently... "
A Hand-book for Cement Users - Page 47
by Charles Carroll Brown - 1905 - 369 pages
Full view - About this book

A Manual of Cement Testing: For the Use of Engineers and Chemists in ...

William Allyn Richards, Henry Briggs North - Cement - 1912 - 196 pages
...placed on the No. 200 sieve, which, with pan and cover attached, is held in one hand in a slightly inclined position, and moved forward and backward,...operation is continued until not more than one-tenth of i per cent passes through after one minute of continuous sieving. The residue is weighed, then placed...
Full view - About this book

A Treatise on Cement Specifications: Including the General Use, Purchase ...

Jerome Cochran - Cement - 1912 - 152 pages
...placed on the No. 200 sieve, which, with pan and cover attached, shall be held in one hand in a slightly inclined position, and moved forward and backward,...rate of about 200 strokes per minute. The operation shall be continued until not more than one-tenth of 1% passes through after one minute of continuous...
Full view - About this book

Annual Report, Volume 4, Part 1913

Association for Standardizing Paving Specifications - Pavements - 1913 - 202 pages
...placed on the No. 200 sieve, which, with pan and cover attached, is held in one hand in a slightly inclined position, and moved forward and backward,...operation is continued until not more than one-tenth of 1% passes through after one minute of continuous sieving. The residue is weighed, then placed on the No....
Full view - About this book

Annual Report, Volume 4

Association for Standardizing Paving Specifications - Pavements - 1913 - 202 pages
...placed on the No. 200 sieve, which, with pan and cover attached, is held in one hand in a slightly inclined position, and moved forward and backward,...operation is continued until not more than one-tenth of 1% passes through after one minute of continuous sieving. The residue is weighed, then placed on the No....
Full view - About this book

Experimental Engineering and Manual for Testing

Rolla Clinton Carpenter, Herman Diederichs - Building materials - 1913 - 1352 pages
...previously been dried. The coarsely screened sample is weighed and placed on the No. 200 sieve, which is moved forward and backward, at the same time striking...operation is continued until not more than one-tenth of one per cent passes through per minute. The work is expedited by placing in the sieve a small quantity...
Full view - About this book

A Treatise on the Inspection of Concrete Construction: Containing Practical ...

Jerome Cochran - Concrete construction - 1913 - 618 pages
...with pan arid cover attached, should he held in one hand in a slightly inclined position, and mixed forward and backward, at the same time striking the...rate of about 200 strokes per minute. The operation should be continued until not more than one-tenth of 1 per cent passes through after one minute of...
Full view - About this book

Civil Engineers' Pocket Book: A Reference-book for Engineers, Contractors ...

Albert Irvin Frye - Civil engineering - 1913 - 1698 pages
...attached is held in one hand in a slightly inclined position, and moved forward and backward, at the sara* time striking the side gently with the palm of the other hand, at the rate of about 200 strokes per min., and continued until not more than ,^ of 1% passes through after 1 minute of continuous sieving....
Full view - About this book

Civil Engineers' Pocket Book: A Reference-book for Engineers, Contractors ...

Albert Irvin Frye - Civil engineering - 1913 - 1694 pages
...held in one hand in a slightly inclined position, and moved forward and backward, at the sa пиtime striking the side gently with the palm of the other hand, at the rate of about 200 strokes per min., and continued until not more than Л of 1% passes through after 1 minute of continuous sieving....
Full view - About this book

Standard Methods of Chemical Analysis: A Manual of Analytical ..., Volume 2

Wilfred Welday Scott - Analytical chemistry - 1922 - 684 pages
...its pan attached. The cover is now placed on the sieve and the latter held in one hand, in a slightly inclined position, and moved forward and backward,...with the palm of the other hand, at the rate of about 150 strokes per minute. The operation is continued until not more than one-tenth of 1% (0.05 gram)...
Full view - About this book

Proceedings of the American Society of Civil Engineers, Volume 35, Part 1

American Society of Civil Engineers - Civil engineering - 1909 - 904 pages
...placed on the No. 200 sieve, which, with pan and cover attached, is held in one hand in a slightly inclined position, and moved forward and backward,...the same time striking the side gently with the palm Affairs.] REPORT: SPECIAL COMMITTEE ON TESTS OF CEMENT 75 of the other hand, at the rate of about 200...
Full view - About this book




  1. My library
  2. Help
  3. Advanced Book Search
  4. Download EPUB
  5. Download PDF